Skip to content
studiomore

Conversion & refurbishment · Housing

Haus U5

Conversion and energy refurbishment of a 1950s detached house – a ceiling opening connects the living space to the garden across several new levels.

Haus U5 – double-height living space with seating staircase and garden view

Starting point

The existing detached house from the 1950s was used storey by storey and no longer met the spatial or energy needs of its residents.

Design idea

The house was completely rethought. Alongside a full energy refurbishment, the focus was on reimagining the architectural space: by breaking through the existing ceiling above the basement, the living space opens towards the garden and connects interior and exterior across several newly created levels.

Spatial interventions

The different height levels zone the interior without separating it and provide level access to the new terrace. Removing the ceiling creates a generous, inviting living area; the seating staircase acts as an extended living room and meeting point of the house. On the upper floor, the former kitchen becomes the new family bathroom.

Material, energy, sustainability

Energy refurbishment: heat pump, window replacement with triple insulating glazing and external sun protection as summer heat protection, insulation of the upper and lower building envelope, and external wall insulation with mineral wool.

Result

The build-out of the seating staircase is planned as a second construction phase; until then, a calm alcove forms next to the new stair. The construction process is documented in before-and-after photographs.

The seating staircase acts as an extended living room – the meeting point of the house.
Existing building / removal of the floor slab to create the double-height space.
New garden access / large window openings for maximum daylight.
Ground floor plan: existing / conversion.
Drawing legend:
Existing fabric
Drawing legend:
New intervention
Drawing legend:
Demolition
First floor plan: existing / conversion.
Drawing legend:
Existing fabric
Drawing legend:
New intervention
Drawing legend:
Demolition
Section: existing / conversion.
Drawing legend:
Existing fabric
Drawing legend:
New intervention
Drawing legend:
Demolition
Before / after: existing condition July 2024 and conversion state August 2024.
Photographs from the conversion.

Free initial consultation

What would you like to rethink?

A project or an idea? We offer free initial consultations and look forward to an inspiring exchange.

Book an initial consultation